Washington, D.C.
todayJuly 6, 2021
Washington, D.C.
DC Water
JA Underground
28% Minority Business Enterprise (MBE), 4% Women-Owned Business Enterprise (WBE), 32% Minority Business Enterprise (MBE), 6% Women Owned Business Enterprise (WBE)
In preparation for construction of the Northeast Boundary Tunnel Project, scheduled to start in 2017, DC Water is working to relocate existing water, sewer, gas, electric, and communication services at pivotal points along the tunnel alignment. The relocation of these services along the future tunnel alignment is critical for successful completion of the project. DC Water is coordinating efforts with Washington Gas, Pepco, and Verizon during the process to minimize disruptions in these services.
L. S. Caldwell & Associates, Inc. (LSC) has responsibility for the development, implementation, and monitoring of the Fair Share Objective initiatives for the District of Columbia Water and Sewer Authority’s (DC Water) Clean Rivers Project. This $2.6 billion program is the result of a Consent Decree signed by the District of Columbia, the Environmental Protection Agency, the Department of Justice. DC Water was required to clean up the Anacostia and Potomac Rivers by 2025. Seven discrete portions of the work, called Divisions, are underway; totaling approximately $819,368,566.00. Twelve Divisions are anticipated.
Written by: QueveraAdmin